A Sawyer company - serving Orlando, FL
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cover Kitchen Remodeling Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Orlando
A remodeled kitchen with painted cabinets and a farmhouse sink
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Cover Kitchen Remodeling: The Orlando Owner’s Guide

A full Cover kitchen remodel in Orlando typically runs $14,000 to $45,000 installed, depending on cabinet line, countertop material, and whether walls or plumbing move. We stock Cover-compatible cabinetry components and install complete kitchen remodels for Orlando homeowners, usually starting within two to three weeks of your written estimate. Most owners discover their kitchen has failed them the slow way: a drawer front that won’t sit flush anymore, a hinge that groans like a garage door, or laminate that started peeling at the seam above the dishwasher after three Florida summers of humidity.

Call (850) 809-0306

If your Cover kitchen is showing its age, you’re not chasing a phantom. Cover cabinetry, like most mid-tier lines, has known wear points. We’ll walk through what fails, what it costs, and whether you’re better off repairing or gutting the whole thing. Quick answer: if three or more doors are failing and the boxes are soft at the corners, replacement beats repair every time.

Key Takeaways

  • Full Cover kitchen remodel in Orlando: $14,000 – $45,000
  • Cabinet-only replacement: $4,000 – $13,000
  • Countertop swap: $2,000 – $6,500
  • We install KraftMaid, Cambria, and Silestone as compatible upgrade paths
  • Every job gets a written price before work starts, backed by our 365-Day Done Right Promise

Which Cover Models This Applies To

A remodeled kitchen with a waterfall island and wood cabinets

Cover cabinetry spans several lines, and the parts are not all interchangeable. The most common lines we see in Orlando kitchens are the Cover Basics series (flat-slab doors, standard 5/8″ boxes) and the Cover Select series (raised-panel doors, soft-close hinges, full-extension drawer glides). The Select line uses Blum-style clip hinges with a 35mm cup bore; the Basics line uses a rear-mounted European cup hinge with a 26mm bore. If you buy a replacement hinge off a big-box shelf without checking the bore size, you’ll drill a second set of holes and the door will never hang right. That’s the single biggest compatibility gotcha we correct for homeowners who tried to DIY it first.

For OEM versus aftermarket on Cover specifically: Cover sources their hinges and drawer slides from mid-tier overseas suppliers. We’ve had better longevity with Blum or Salice aftermarket hardware on Cover boxes, particularly in Orlando’s humidity, where the factory soft-close dampers tend to seize up around year six or seven. The cabinet boxes themselves are usually fine; it’s the moving hardware and the door faces that fail first. If your doors are delaminating or the thermofoil is peeling, that’s a door-face problem, not a hardware problem, and no hinge replacement fixes it.

Cover also marketed a “quick-assembly” line through a national orange-box retailer. Those boxes confirm with cam locks and are half-inch particleboard. We can repair them, but honestly, if you have that line, the remodel conversation changes. In College Park bungalows and Conway ranch houses alike, we see that line hit the end of its service life right around the ten-year mark.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Cover Kitchen Remodeling Is Failing

  • Doors that sag or scrape the frame. The hinge screws stripped out of the particleboard stile, or the hinge itself wore at the pivot. Once the screw holes wallow out, tightening them back only works once; after that, the hole is gone.
  • Drawer fronts separating from the drawer box. Cover used a two-piece drawer construction on several lines. The front panel is glued and stapled to a separate box, and Florida humidity plus years of heavy silverware trays will eventually split that joint.
  • Thermofoil peeling at the bottom edges. This is the dishwasher-adjacent door problem. Heat and moisture break down the adhesive film, and once peeling starts, it spreads. No adhesive we’ve tested holds long-term; those doors get replaced, not re-glued.
  • Soft-close mechanism slamming or not catching. The internal damper is shot. On Cover Select, that means a hinge replacement; on the Basics line, the hinge was never soft-close, so if someone sold you “soft-close” and it never was, that’s a different conversation.
  • Box corners flexing or showing moisture swelling. This is the structural red flag. If the corner joints are loose or the bottom panel is bowed under the sink, the box itself is compromised. Hardware and doors won’t save a bad box.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A small remodeled galley kitchen with cabinets to the ceiling

Here’s the honest Orlando market breakdown for Cover kitchen work:

  • Full Cover kitchen remodel (cabinets, counters, backsplash, fixtures): $14,000 – $45,000
  • Smaller kitchen or galley remodel with stock cabinets: $9,000 – $20,000
  • Cabinet replacement only (boxes and doors, mid-grade): $4,000 – $13,000
  • Countertop replacement with Cambria or Silestone quartz: $2,000 – $6,500
  • Backsplash tiling: $800 – $2,500

What drives the range: linear feet of cabinetry, whether you’re changing the layout (moving plumbing or electrical), the cabinet line you choose as a replacement, and countertop material. A 10×10 Orlando galley with stock KraftMaid boxes and a basic quartz top lands at the low end. A 20×18 open-concept kitchen with custom-paneled cabinets, a waterfall island, and a tile backsplash with a feature wall pushes toward the top.

Every job includes demolition and haul-away of the old Cover cabinets, the written price before we start (so the invoice matches the number you approved), and our 365-Day Done Right Promise. If something isn’t right a year later, we make it right. In writing, on every project.

DIY or Call Us?

Cabinet and countertop work is not a high-tension danger zone like garage springs or live electrical, so DIY is not an automatic no. Replacing a single hinge or drawer glide is a 20-minute job if you can identify the bore size and the overlay. But let’s be straight about where DIY goes sideways on Cover kitchens: thermofoil peeling never glues back, drilling a misaligned cup bore destroys the door, and re-hanging a sagging door with longer screws usually splits the stile. We’ve fixed enough homeowner attempts to know it costs more to undo a bad repair than to do the original job right.

If you’re confident, one hinge at a time is fine. If you’re looking at three failing doors, a delaminating face, or soft drawers, call (850) 809-0306. Luca Romano and the crew will tell you honestly whether it’s a repair or a remodel, and the estimate is free.

FAQs

A walk-in pantry with wood shelving

Getting started with Sawyer in Orlando

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Orlando team

A local crew that works across Orlando and the towns around it, to the same written standard as every Sawyer location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Orlando? Licensed & insured · Free in-home estimates response · free estimates
Call (850) 809-0306
Local Service Coverage

Request a Free Estimate in Orlando

Tell us what you need - Sawyer Remodel Orlando responds fast. No obligation.

By sending this request, you agree to the terms of our Privacy Policy and consent to receive communications by telephone, text message, or email about your request, including by the independent professionals who may fulfill it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch